Domiatec station is located at the Sadat City, constructed on a total area of 31,000 m2 in a
distinctive location accessible through the Cairo-Alexandria Desert Road adding value to the
position ideal for storage whether for both factories and shipping activities.
The capacity of cold storage can accommodate 15,000 tons (expandable to 30,000 tons) for
cooling as well as freezing.
The layout is designed to enable entry and exit together with built docks and a
hangar for dry storage exceeding 3,400 m2 housing purpose-built grading and sorting
equipment for several crops; mainly to suit the seed potatoes and potatoes ware among
others.
Taking into consideration the installment of the state-of-the-art ventilation
and chiller systems, making it one of the most reliable storage facilities in the
region.